We had Pre-lining inspections around Week19 and the report had arrived with a few defects.Some walls required straightening, balcony posts were not installed, lower gutter was not installed. We spoke to our Supervisor about it and he set aside dates to work on them.

The Week 20 was when Gyprock was to be installed. We received the invoice stating it had been done. We were excited to see the Gyprock progress and visited our site.We also had our landscaping appointment and we decided to do the driveway and steps with W so that we make use of their landscaping voucher.

This was the moment.Our home was coming together. All our hardwork was showing results.I love the pictures of this part of the build.

 

 