Week 20-21 Prelining and Gyprock

We had Pre-lining inspections around Week19 and the report had arrived with a few defects.Some walls required straightening, balcony posts were not installed, lower gutter was not installed. We spoke to our Supervisor about it and he set aside dates to work on them. The Week 20 was when Gyprock was to be installed. We... Continue Reading →